Fix/openstack connection creation #1930
e2e_test.yaml
on: pull_request
end-to-end test using private-endpoint
/
Plan
5s
Matrix: end-to-end test using private-endpoint / build
Matrix: end-to-end test using private-endpoint / Integration tests / Integration tests
end-to-end test using private-endpoint
/
Plan Image Scanning
2s
end-to-end test using private-endpoint
/
Required Integration Test Status Checks
0s
Matrix: end-to-end test using private-endpoint / scan
Required E2E Test Status Checks
0s
Annotations
4 errors and 2 warnings
end-to-end test using private-endpoint / Integration tests / Integration tests (test_e2e)
Process completed with exit code 127.
|
end-to-end test using private-endpoint / Integration tests / Integration tests (test_e2e)
Docker build failed with exit code 1
|
end-to-end test using private-endpoint / Required Integration Test Status Checks
Process completed with exit code 1.
|
Required E2E Test Status Checks
Process completed with exit code 1.
|
end-to-end test using private-endpoint / Integration tests / Integration tests (test_e2e)
Docker build failed with exit code 1, back off 5.46 seconds before retry.
|
end-to-end test using private-endpoint / Integration tests / Integration tests (test_e2e)
Docker build failed with exit code 1, back off 2.631 seconds before retry.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
2024-10-17T09-42-41-9aca__build__output__charm__github-runner
|
25.4 MB |
|
2024-10-17T09-42-41-9aca__plan
|
298 Bytes |
|