Skip to content

fix: chown of existing reactive runner log dir #1937

fix: chown of existing reactive runner log dir

fix: chown of existing reactive runner log dir #1937

Re-run triggered October 21, 2024 09:11
Status Failure
Total duration 2m 0s
Artifacts 2

e2e_test.yaml

on: pull_request
end-to-end test using private-endpoint  /  Plan
5s
end-to-end test using private-endpoint / Plan
Matrix: end-to-end test using private-endpoint / build
Matrix: end-to-end test using private-endpoint / Integration tests / Integration tests
end-to-end test using private-endpoint  /  Plan Image Scanning
3s
end-to-end test using private-endpoint / Plan Image Scanning
end-to-end test using private-endpoint  /  Required Integration Test Status Checks
0s
end-to-end test using private-endpoint / Required Integration Test Status Checks
Matrix: end-to-end test using private-endpoint / scan
Required E2E Test Status Checks
0s
Required E2E Test Status Checks
Fit to window
Zoom out
Zoom in

Annotations

4 errors
end-to-end test using private-endpoint / Integration tests / Integration tests (test_e2e)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
end-to-end test using private-endpoint / Required Integration Test Status Checks
Process completed with exit code 1.
Required E2E Test Status Checks
Process completed with exit code 1.