Skip to content

update changelog

update changelog #1457

Triggered via push October 24, 2024 06:38
Status Failure
Total duration 52m 58s
Artifacts 2
Integration test using private-endpoint  /  Plan
2s
Integration test using private-endpoint / Plan
Matrix: Integration test using private-endpoint / build
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
Integration test using private-endpoint  /  Plan Image Scanning
2s
Integration test using private-endpoint / Plan Image Scanning
Integration test using private-endpoint  /  Required Integration Test Status Checks
0s
Integration test using private-endpoint / Required Integration Test Status Checks
Matrix: Integration test using private-endpoint / scan
Fit to window
Zoom out
Zoom in

Annotations

6 errors and 2 warnings
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_failure)
The self-hosted runner: stg-gh-deploy-29-9f2e7d2a8594d9edb350557f lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
Integration test using private-endpoint / Required Integration Test Status Checks
Process completed with exit code 1.
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_success)
Docker build failed with exit code 1, back off 1.928 seconds before retry.
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_success)
Docker build failed with exit code 1, back off 9.445 seconds before retry.

Artifacts

Produced during runtime
Name Size
2024-10-24T06-38-17-8abc__build__output__charm__github-runner
25.4 MB
2024-10-24T06-38-17-8abc__plan
299 Bytes