* add standard for integration tests
* add definition of tool and types of tests
* add guidance for business critical versus non
  • Loading branch information
jdkandersson authored Feb 9, 2023
1 parent a599b2e commit 7fa263a
Showing 1 changed file with 108 additions and 0 deletions.
108 changes: 108 additions & 0 deletions CONTRIBUTING.md
Original file line number Diff line number Diff line change
Expand Up @@ -19,6 +19,58 @@
- [Test Structure](#test-structure)
- [Type Hints](#type-hints)
- [When to use Python or Shell](#when-to-use-python-or-shell)
- [When to Write and What to Cover In Integration Tests](when-to-write-and-what-to-cover-in-integration-tests)

## Definitions

### Tool

A tool is a project the team works on which isn't a charm, such as a GitHub
action.

### Unit Tests

These are tests that cover charm/ service functions to ensure that given a
specific context and mocked interfaces, the function returns the expected
output. Tests could cover more than one function if some of them don't include
business logic. These tests shouldn't be functional, they just ensure that the
code is doing what it's supposed to do. A test that requires too many mocks
indicates the design needs to be improved to reduce coupling.

### Integration Tests

Integration tests ensure that the charm integrated with its dependencies will
behave properly. It doesn't test the code in a production like environment,
meaning that we don't connect to environments with equivalent resources and
production like datasets. The integration tests will spawn specific dependencies
that could differ from the production one (e.g using localstack instead of
openstack, sqlite instead of a production grade database, ...). These tests can
be functional (they ensure that the features provided by the charm are working
as intended) or focus on checking an abstracted interface. They don't
necessarily need to ensure that the API/Service/CLI they're interacting with are
working as intended.

### End To End Tests

These are simulated user scenarios running on an environment as close as
possible to production. They ususally run on a staging environment with
preexisting data, and interact with the charm as a user would (ideally using the
juju cli). These are functional tests and ensure that the charm is working as
intended in the condition close to production in order to detect issues related
to this environment (ressources, pre-existing condition, migrations, ...).

### Smoke Tests

These are functional tests for business critical use cases used to ensure that
the most critical features are still working after a production deployment. The
aim is to ensure that a deployment didn't impact business continuity and detect
potential defects immediately after a production release.

### Business Critical Charm

This charm is critical to the operations of Canonical or our customers. Any
bugs, security issues or other problems will have a wide impact to important
business processes.

## Programming Languages and Frameworks

Expand Down Expand Up @@ -318,6 +370,62 @@ Alternatives to merging the PR with failing status checks include:

This will ensure that we minimise the number of bugs in our code and tooling.

## When to Write and What to Cover In Integration Tests

The team creates charms and tooling used and intended to be used directly or as
building blocks for mission critical purposes by both Canonical and external
users. The charms and tools we provide need to meet a high quality bar to ensure
that they work for our users as intended. If we ship charms and tools that don't
meet this high standard, the impact could be widespread.

This standard covers when to write integration tests and also provides guidance
on what should be covered by them.

The intent of integration tests is to check that what we provide to our users
works as advertised. There are two key concepts in that statement:
`what we provide` and `works as advertised`. `what we provide` addresses the
scope of our integration tests which are the features specifically provided by
the charm or tool. The following examples illustrate what this means by
providing guidance on what should and should not be covered by integration
tests.

The following should be covered by integration tests for business critical
charms:

* An action the charm provides
* An integration the charm provides
* A configuration the charm provides
* That the workload is up and running
* The features of a tool

The reason these examples should be covered is because we are accountable for
these features of a charm or tool by being its owner. Charms that are not
business critical may not include integration tests for these examples based on
the value these tests would provide compared to the cost of writing them.

The following does not usually need to be covered by integration tests because
we do not own them:

* A feature provided by the workload which is not enhanced by the charm
* That GitHub works
* That the network works
* That the operating system works
* That Kubernetes works
* That Juju works

To address the second concept of `works as advertised`, when writing an
integration test for business critical charms, it is not sufficient to just
check that, for example, that Juju reports that running the action was
successful. Additional checks need to be executed to ensure that whatever the
action was intended to achieve worked. For charms that are not business
critical, the checks can be more relaxed, such as just checking that juju
reports success for the action that was triggered.

By writing integration tests that cover the features provided by the charm, we
ensure that we are meeting the expectations our users have of us. This will make
the charms and tools we provide reliable and enable our users to use them for
their use cases, including those that are business critical.

## Charm Configuration Option Description

The charm configuration is defined in a single file named config.yaml. Each
Expand Down