[DPE-2561] POC - Start with provided config option: config-server, shard #753
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
ci.yaml
on: pull_request
Build charms
/
...
/
Get workflow version
3s
Matrix: Build charms / build
Matrix: integration-test
Annotations
10 errors and 1 warning
metric-integration
Canceling since a higher priority waiting request for 'Tests-refs/pull/246/merge' exists
|
metric-integration
The operation was canceled.
|
relation-integration
Canceling since a higher priority waiting request for 'Tests-refs/pull/246/merge' exists
|
relation-integration
The operation was canceled.
|
tls-integration
Canceling since a higher priority waiting request for 'Tests-refs/pull/246/merge' exists
|
tls-integration
The operation was canceled.
|
backup-integration
Canceling since a higher priority waiting request for 'Tests-refs/pull/246/merge' exists
|
backup-integration
The operation was canceled.
|
ha-integration
Canceling since a higher priority waiting request for 'Tests-refs/pull/246/merge' exists
|
ha-integration
The operation was canceled.
|
Check libraries
The following actions uses node12 which is deprecated and will be forced to run on node16: canonical/charming-actions/[email protected]. For more info: https://github.blog/changelog/2023-06-13-github-actions-all-actions-will-run-on-node16-instead-of-node12-by-default/
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
charms-packed-with-cache
Expired
|
18.9 MB |
|
juju-crashdump
Expired
|
318 KB |
|