ci: refactor using data platform workflows #32
ci.yaml
on: pull_request
Get charm paths and charmhub channel
7s
Matrix: Lint
Matrix: Unit tests
Matrix: build
Matrix: Check libraries
Matrix: Terraform
Annotations
4 errors
Integration tests (microk8s) (jupyter-ui)
Canceling since a higher priority waiting request for 'CI-refs/pull/426/merge' exists
|
Integration tests (microk8s) (jupyter-ui)
The operation was canceled.
|
Integration tests (microk8s) (jupyter-controller)
Canceling since a higher priority waiting request for 'CI-refs/pull/426/merge' exists
|
Integration tests (microk8s) (jupyter-controller)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
packed-charm-charms-jupyter-controller--platform-ubuntu@20.04-amd64
|
20.7 MB |
|
20.7 MB |
|