Skip to content

carltonsmith/simple_calendar

 
 

Folders and files

NameName
Last commit message
Last commit date

Latest commit

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Repository files navigation

travis ci

Simple Calendar

Simple Calendar is designed to do one thing really really well: render a calendar. It lets you render a calendar of any size. Maybe you want a day view, a 4 day agenda, a week view, a month view, or a 6 week calendar. You can do all of that with the new gem, just give it a range of dates to render.

It doesn't depend on any ORM so you're free to use it with ActiveRecord, Mongoid, any other ORM, or pure Ruby objects.

Thanks to all contributors for your wonderful help!

calendar

Installation

Just add this into your Gemfile followed by a bundle install:

gem "simple_calendar", "~> 2.0"

If you're using Bootstrap, the calendar should already have a border and nice spacing for days.

Optionally, you can include the default stylesheet for the calendar in your app/assets/stylesheets/application.css file:

*= require simple_calendar

Usage

Generating calendars is extremely simple with simple_calendar.

The first parameter is a symbol that looks up the current date in params. If no date is found, it will use the current date.

In these examples, we're using :start_date which is the default.

Month Calendar

You can generate a calendar for the month with the month_calendar method.

<%= month_calendar do |date| %>
  <%= date %>
<% end %>

To show the day of the month instead of the date, use <%= date.day %>

Week Calendar

You can generate a week calendar with the week_calendar method.

<%= week_calendar number_of_weeks: 2 do |date| %>
  <%= date %>
<% end %>

Setting number_of_weeks is optional and defaults to 1.

Custom Length Calendar

You can generate calendars of any length by passing in the number of days you want to render.

<%= calendar number_of_days: 4 do |date| %>
  <%= date %>
<% end %>

Setting number_of_days is optional and defaults to 4.

Custom Parameter Name

You can pass in start_date_param to change the name of the parameter in the URL for the current calendar view.

<%= calendar start_date_param: :my_date do |date| %>
  <%= date %>
<% end %>

Custom Partial

You can set a different partial name for calendars by passing the partial path.

<%= calendar partial: 'products/calendar' do |date| %>
  <%= date %>
<% end %>

Rendering Events

What's a calendar without events in it? There are two simple steps for creating calendars with events.

The first step is to add the following to your model. We'll be using a model called Meeting, but you can add this to any model or Ruby object.

Here's an example model:

# single day events
$ rails g scaffold Meeting name start_time:datetime

# multi-day events
$ rails g scaffold Meeting name start_time:datetime end_time:datetime

By default it uses start_time as the attribute name.
If you'd like to use another attribute other than start_time, just pass it in as the attribute

<%= month_calendar(attribute: :starts_at) do |date| %>
  <%= date %>
<% end %>

Optionally the end_time attribute can be used which enables multi-day event rendering.

Just pass in the attribute and end_attribute options respectively

<%= month_calendar(attribute: :start_date, end_attribute: :end_date) do |date| %>
  <%= date %>
<% end %>

If you already have a model with a start time attribute called something other than start_time or accesses it through a relationship, you can alias the attribute by defining a start_time method in the my_model.rb file and not have to specify it separately as in the above example

class MyModel
    ## Other code related to your model lives here

    def start_time
        self.my_related_model.start ##Where 'start' is a attribute of type 'Date' accessible through MyModel's relationship
    end
end

In your controller, query for these meetings and store them in an instance variable. Normally you'll want to search for the ones that only show up inside the calendar view (for example, you may only want to grab the events for the current month).

We'll just load up all the meetings for this example.

def index
  @meetings = Meeting.all
end

Then in your view, you can pass in the events option to render. The meetings will automatically be filtered out by day for you.

<%= month_calendar events: @meetings do |date, meetings| %>
  <%= date %>

  <% meetings.each do |meeting| %>
    <div>
      <%= meeting.name %>
    </div>
  <% end %>
<% end %>

If you pass in objects that don't respond to the attribute method (like starts_at), then all the meetings will be yielded each day. This lets you do custom filtering however you want.

Customizing The Calendar

There are a handful of configuration options that you can use in simple_calendar.

Customizing Views

You can customize the layouts for each of the calendars by running the generators for simple_calendar:

$ rails g simple_calendar:views

This will generate a folder in app/views called simple_calendar that you edit to your heart's desire.

Time Zones

Setting Time.zone will make sure the calendar start days are correctly computed in the right timezone. You can set this globally in your application.rb file or if you have a User model with a time_zone attribute, you can set it on every request by using a before_action like the following example.

This code example uses Devise's current_user and user_signed_in? methods to retrieve the user's timezone and set it for the duration of the request. Make sure to change the :user_signed_in? and current_user methods if you are using some other method of authentication.

class ApplicationController < ActionController::Base
  before_action :set_time_zone, if: :user_signed_in?

  private

    def set_time_zone
      Time.zone = current_user.time_zone
    end
end

If you want to set the time zone globally, you can set the following in config/application.rb:

config.time_zone = 'Central Time (US & Canada)'

Beginning Of Week

You can also change the beginning day of the week by setting Date.beginning_of_week in a before_action just like in the previous example. If you want to set this globally, you can put this line in config/application.rb:

config.beginning_of_week = :sunday

Custom CSS Classes

Setting classes on the table and elements are pretty easy.

simple_calendar comes with a handful of useful classes for each day in the calendar that you can use:

.simple-calendar {
  .day {}

  .wday-0 {}
  .wday-1 {}
  .wday-2 {}
  .wday-3 {}
  .wday-4 {}
  .wday-5 {}
  .wday-6 {}

  .today {}
  .past {}
  .future {}

  .start-date {}

  .prev-month {}
  .next-month { }
  .current-month {}

  .has-events {}
}

Just paste this into a CSS file and add your styles and they will be applied to the calendar. All of these classes are inside of the simple-calendar class so you can scope your own classes with similar names.

Custom Header Title And Links

Header and title links are easily adjusted by generating views and modifying them inside your application.

For example, if you'd like to use abbreviated month names, you can modify the views from this:

<%= t('date.month_names')[start_date.month] %> <%= start_date.year %>

To

<%= t('date.abbr_month_names')[start_date.month] %> <%= start_date.year %>

Your calendar will now display "Sep 2015" instead of "September 2015" at the top! :)

AJAX Calendars

Rendering calendars that update with AJAX is pretty simple. You'll need to wrap your calendar in a div, overwrite the next_link and previous_link options, and setup your controller to respond to JS requests. The response can simply replace the HTML of the div with the newly rendered calendar.

Take a look at excid3/simple_calendar-ajax-example to see how it is done.

Custom Calendars

The three main calendars available should take care of most of your needs, but simple_calendar makes it easy to create completely custom calendars (like maybe you only want business weeks).

If you'd like to make a completely custom calendar, you can create a new class that inherits from SimpleCalendar::Calendar. The name you give it will correspond to the name of the template it will try to render.

The main method you'll need to implement is the date_range so that your calendar can have a custom length.

class SimpleCalendar::BusinessWeekCalendar < SimpleCalendar::Calendar
  private

    def date_range
      beginning = start_date.beginning_of_week + 1.day
      ending    = start_date.end_of_week - 1.day
      (beginning..ending).to_a
    end
end

To render this in the view, you can do:

<%= SimpleCalendar::BusinessWeekCalendar.new(self, {}).render do |date| %>
  <%= date %>
<% end %>

And this will render the app/views/simple_calendar/_business_week_calendar.html.erb partial.

You can copy one of the existing templates to use for the partial for your new calendar.

View Specs and Tests

If you're running view specs against views with calendars, you may run into route generation errors like the following:

Failure/Error: render
ActionView::Template::Error:
  No route matches {:action=>"show", :controller=>"controller_name", :start_date=>Sun, 29 Mar 2015}

If so, you can stub out the appropriate method like so (rspec 3 and up):

expect_any_instance_of(SimpleCalendar::Calendar).to receive(:link_to).at_least(:once).and_return("")

With modifications as appropriate.

TODO

  • Rspec tests for Calendar
  • Rspec tests for MonthCalendar
  • Rspec tests for WeekCalendar

Author

Chris Oliver [email protected]

https://gorails.com

@excid3

Support

Need help

About

A wonderfully simple calendar gem for Rails

Resources

License

Stars

Watchers

Forks

Packages

No packages published

Languages

  • Ruby 79.4%
  • HTML 14.6%
  • CSS 5.8%
  • Shell 0.2%