Build & Integration Tests: alvarof2/test #3577
Triggered via pull request
September 16, 2024 15:06
Status
Failure
Total duration
1h 11m 23s
Artifacts
–
celo-monorepo.yml
on: pull_request
Install dependencies
4m 33s
Protocol Test Release
2m 6s
Matrix: certora-test
Matrix: end-to-end-geth-matrix
Matrix: protocol-test-matrix
Annotations
18 errors and 10 warnings
Protocol Test Release
Process completed with exit code 1.
|
e2e Blockchain Parameters test
The self-hosted runner: k8s-hosted-runners-monorepo-7g9wp-9xnrl lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
|
Protocol Compatibility
The job running on runner k8s-hosted-runners-monorepo-7g9wp-ctx7z has exceeded the maximum execution time of 60 minutes.
|
Protocol Compatibility
The operation was canceled.
|
Protocol Common tests
The job running on runner k8s-hosted-runners-monorepo-7g9wp-zrbj9 has exceeded the maximum execution time of 60 minutes.
|
Protocol Common tests
The operation was canceled.
|
e2e Replica test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-kxtjs has exceeded the maximum execution time of 60 minutes.
|
e2e Replica test
The operation was canceled.
|
e2e Governance test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-qknwp has exceeded the maximum execution time of 60 minutes.
|
e2e Governance test
The operation was canceled.
|
e2e Slashing test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-zfs6v has exceeded the maximum execution time of 60 minutes.
|
e2e Slashing test
The operation was canceled.
|
e2e Transfer test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-x5bwf has exceeded the maximum execution time of 60 minutes.
|
e2e Transfer test
The operation was canceled.
|
e2e Sync test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-whv9q has exceeded the maximum execution time of 60 minutes.
|
e2e Sync test
The operation was canceled.
|
e2e Validator order test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-fw7qc has exceeded the maximum execution time of 60 minutes.
|
e2e Validator order test
The operation was canceled.
|
Install dependencies
The following actions use a deprecated Node.js version and will be forced to run on node20: tj-actions/glob@v19. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
|
e2e Blockchain Parameters test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
|
Protocol Compatibility
Attempt 1 failed. Reason: Timeout of 2400000ms hit
|
Protocol Common tests
Attempt 1 failed. Reason: Timeout of 2400000ms hit
|
e2e Replica test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
|
e2e Governance test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
|
e2e Slashing test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
|
e2e Transfer test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
|
e2e Sync test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
|
e2e Validator order test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
|