Skip to content

build(deps): Bump github/super-linter from 5 to 6 #3677

build(deps): Bump github/super-linter from 5 to 6

build(deps): Bump github/super-linter from 5 to 6 #3677

Status Cancelled
Total duration 26m 25s
Artifacts 8

dispatch.yml

on: push
Release  /  Super Linter
Release / Super Linter
Release  /  Check release condition
Release / Check release condition
Release  /  Docker image
Release / Docker image
Release  /  Node binary
Release / Node binary
Fit to window
Zoom out
Zoom in

Annotations

1 error and 1 warning
Tests / Report
Unable to download artifact(s): Artifact not found for name: report-integration.xml Please ensure that your artifact is not expired and the artifact was uploaded using a compatible version of toolkit/upload-artifact. For more information, visit the GitHub Artifacts FAQ: https://github.com/actions/toolkit/blob/main/packages/artifact/docs/faq.md
Tests / Integration Tests
Received request to deprovision: The request was cancelled by the remote provider.

Artifacts

Produced during runtime
Name Size
cheqd-node-build.tar Expired
52.4 MB
cheqd-noded Expired
26.9 MB
report-post-upgrade.xml Expired
1.86 KB
report-pre-upgrade.xml Expired
2.57 KB
report-pricing-change.xml Expired
6.26 KB
report-pricing-proposal.xml Expired
2.27 KB
report-unit.xml Expired
15.6 KB
report-upgraded-integration.xml Expired
7.55 KB