Skip to content

Add more positive integration test for testing #1107

Add more positive integration test for testing

Add more positive integration test for testing #1107

Triggered via push June 19, 2023 13:48
Status Success
Total duration 6m 6s
Artifacts 3
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

dispatch.yml

on: push
Lint  /  Broken Markdown links
31s
Lint / Broken Markdown links
Lint  /  Golang Lint
30s
Lint / Golang Lint
Lint  /  Super Linter
1m 43s
Lint / Super Linter
Build  /  Build binary
37s
Build / Build binary
Build  /  Build Docker image
1m 20s
Build / Build Docker image
Test  /  Integration Tests
3m 42s
Test / Integration Tests
Release  /  Check release condition
Release / Check release condition
Release  /  Release Binary
Release / Release Binary
Release  /  Release Docker image
Release / Release Docker image
Fit to window
Zoom out
Zoom in

Annotations

10 errors and 1 warning
Lint / Golang Lint
Cannot open: File exists
Lint / Golang Lint
Cannot open: File exists
Lint / Golang Lint
Cannot open: File exists
Lint / Golang Lint
Cannot open: File exists
Lint / Golang Lint
Cannot open: File exists
Lint / Golang Lint
Cannot open: File exists
Lint / Golang Lint
Cannot open: File exists
Lint / Golang Lint
Cannot open: File exists
Lint / Golang Lint
Cannot open: File exists
Lint / Golang Lint
Cannot open: File exists
Lint / Golang Lint
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2

Artifacts

Produced during runtime
Name Size
cheqd-noded Expired
25.2 MB
did-resolver-staging Expired
21 MB
report-integration.xml Expired
256 KB