Skip to content

Merge pull request #760 from circleci-tools/dependabot/bundler/i18n-1… #1410

Merge pull request #760 from circleci-tools/dependabot/bundler/i18n-1…

Merge pull request #760 from circleci-tools/dependabot/bundler/i18n-1… #1410

Triggered via push March 6, 2024 07:57
Status Failure
Total duration 1m 24s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (2.6.10)
Process completed with exit code 1.
test (2.7.8)
The job was canceled because "_2_6_10" failed.
test (2.7.8)
Process completed with exit code 1.
test (3.0.6)
The job was canceled because "_2_6_10" failed.
test (3.0.6)
The operation was canceled.
test (3.1.4)
The job was canceled because "_2_6_10" failed.
test (3.1.4)
The operation was canceled.
test (3.2.2)
The job was canceled because "_2_6_10" failed.
test (3.2.2)
The operation was canceled.