β»οΈ,π Build an image and upload to ghcr #9
Annotations
1 error and 2 warnings
π Build and push image
buildx failed with: ERROR: tag is needed when pushing to registry
|
π· Prepare docker tags, labels
No Docker image version has been generated. Check tags input.
|
π· Prepare docker tags, labels
No Docker tag has been generated. Check tags input.
|
The logs for this run have expired and are no longer available.
Loading