Merge pull request #2377 from cta-observatory/sphinx-gallery-notebooks #10
Annotations
11 errors
tests (macos-latest, 3.11, mamba)
Process completed with exit code 1.
|
tests (ubuntu-latest, 3.11, pip)
The job was canceled because "macos-latest_3_11_mamba" failed.
|
tests (ubuntu-latest, 3.11, pip)
The operation was canceled.
|
tests (macos-latest, 3.9, pip)
The job was canceled because "macos-latest_3_11_mamba" failed.
|
tests (macos-latest, 3.9, pip)
The operation was canceled.
|
tests (ubuntu-latest, 3.10, mamba, codecov)
The job was canceled because "macos-latest_3_11_mamba" failed.
|
tests (ubuntu-latest, 3.10, mamba, codecov)
The operation was canceled.
|
tests (ubuntu-latest, 3.11, mamba)
The job was canceled because "macos-latest_3_11_mamba" failed.
|
tests (ubuntu-latest, 3.11, mamba)
The operation was canceled.
|
tests (ubuntu-latest, 3.9, mamba)
The job was canceled because "macos-latest_3_11_mamba" failed.
|
tests (ubuntu-latest, 3.9, mamba)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
docs
Expired
|
96.7 MB |
|