Skip to content

load fitbit data into db #85

load fitbit data into db

load fitbit data into db #85

Triggered via push December 29, 2023 21:13
Status Failure
Total duration 33s
Artifacts

ci.yml

on: push
Matrix: lint_and_test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
lint_and_test (3.9)
Process completed with exit code 1.
lint_and_test (3.8)
The job was canceled because "_3_9" failed.
lint_and_test (3.8)
Process completed with exit code 1.
lint_and_test (3.10)
The job was canceled because "_3_9" failed.
lint_and_test (3.10)
The operation was canceled.