Skip to content

Commit

Permalink
Adding interactible table to EVM
Browse files Browse the repository at this point in the history
  • Loading branch information
MatheusBlanco committed Mar 23, 2021
1 parent 6ef205b commit b6d4a7d
Showing 1 changed file with 2 additions and 0 deletions.
2 changes: 2 additions & 0 deletions docs/projeto/evm.md
Original file line number Diff line number Diff line change
Expand Up @@ -20,6 +20,8 @@ O EVM é calculado em uma série de etapas que comprimem a relação de custos,

A tabela de EVM da equipe encontra-se [aqui](https://docs.google.com/spreadsheets/d/1dIPz4ku9tcfeAwUH-QSNfKg3fyFHK_nozA9CRUzxwNs/edit?usp=sharing).

<iframe src="https://docs.google.com/spreadsheets/d/1dIPz4ku9tcfeAwUH-QSNfKg3fyFHK_nozA9CRUzxwNs/edit?usp=sharing" frameborder="0" width="960" height="569" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe>

## Valor planejado (PV)

O valor planejado de um projeto se refere ao custo total do mesmo em determinado período de tempo, levando em consideração o BAC, valor total de custos calculado para o projeto. O BAC deste projeto foi calculado de acordo com custos de ferramentas, salário de membros envolvidos e de equipamentos necessitados para que os mesmos pudessem produzir. Tais valores encontram-se melhor detalhados no [Termo de Abertura de Projeto](./tap.md), e se resume no valor de **R$ 133.520,96**.
Expand Down

0 comments on commit b6d4a7d

Please sign in to comment.