Skip to content

chore(deps): update rust crate test-log to 0.2.16 #79

chore(deps): update rust crate test-log to 0.2.16

chore(deps): update rust crate test-log to 0.2.16 #79

Triggered via pull request April 30, 2024 17:31
Status Failure
Total duration 1m 30s
Artifacts

test.yml

on: pull_request
Matrix: cross
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test (stable, macos-latest)
Process completed with exit code 101.
test (1.74.0, windows-latest)
The job was canceled because "stable_macos-latest" failed.
test (1.74.0, windows-latest)
The operation was canceled.
test (1.74.0, ubuntu-latest)
The job was canceled because "stable_macos-latest" failed.
test (1.74.0, ubuntu-latest)
The operation was canceled.
test (stable, windows-latest)
The job was canceled because "stable_macos-latest" failed.
test (stable, windows-latest)
The operation was canceled.
test (stable, ubuntu-latest)
The job was canceled because "stable_macos-latest" failed.
test (stable, ubuntu-latest)
The operation was canceled.
test (1.74.0, macos-latest)
The job was canceled because "stable_macos-latest" failed.
test (1.74.0, macos-latest)
The operation was canceled.