Configurable longlong.h
#1593
Triggered via pull request
November 19, 2023 20:40
Status
Cancelled
Total duration
10m 19s
Artifacts
–
CI.yml
on: pull_request
Ubuntu GCC, Code Coverage (x10)
3m 59s
Ubuntu GCC with NTL (assert, x2)
3m 11s
macOS GCC with BLAS (x3)
7m 25s
FreeBSD Clang (x0.5)
5m 51s
Cygwin GCC (x0.5)
9m 46s
Ubuntu Clang with examples (x5)
4m 4s
Ubuntu GCC, CMake (no checks)
3m 46s
MinGW GCC (x0.5)
8m 11s
MSVC (x1)
9m 40s
Alpine Linux, musl, 32-bit (assert, x1.5)
5m 43s
Nemo.jl (temporary branch)
2m 58s
Annotations
13 errors
Nemo.jl (temporary branch)
Process completed with exit code 2.
|
Ubuntu GCC with NTL (assert, x2)
Process completed with exit code 2.
|
Ubuntu GCC, Code Coverage (x10)
Process completed with exit code 2.
|
Ubuntu Clang with examples (x5)
Process completed with exit code 2.
|
Alpine Linux, musl, 32-bit (assert, x1.5)
Process completed with exit code 2.
|
FreeBSD Clang (x0.5)
Process completed with exit code 5.
|
FreeBSD Clang (x0.5)
The process '/usr/bin/ssh' failed with exit code 2
|
macOS GCC with BLAS (x3)
Process completed with exit code 2.
|
MinGW GCC (x0.5)
Process completed with exit code 2.
|
MSVC (x1)
Canceling since a higher priority waiting request for 'CI-refs/pull/1633/merge-true' exists
|
MSVC (x1)
The operation was canceled.
|
Cygwin GCC (x0.5)
Canceling since a higher priority waiting request for 'CI-refs/pull/1633/merge-true' exists
|
Cygwin GCC (x0.5)
The operation was canceled.
|