Skip to content

client: Upgrade to react 19 #1039

client: Upgrade to react 19

client: Upgrade to react 19 #1039

Triggered via push December 29, 2024 05:25
Status Failure
Total duration 1m 12s
Artifacts

main.yaml

on: push
Matrix: tests
Upload artefacts
0s
Upload artefacts
Fit to window
Zoom out
Zoom in

Annotations

14 errors
Check with PHP 8.2 and postgresql storage backend
Process completed with exit code 1.
Check with PHP 8.4 and sqlite storage backend
Process completed with exit code 1.
Check with PHP 7.4 and sqlite storage backend
The job was canceled because "_8_2_postgresql" failed.
Check with PHP 7.4 and sqlite storage backend
Process completed with exit code 1.
Check with PHP 8.3 and sqlite storage backend
The job was canceled because "_8_2_postgresql" failed.
Check with PHP 8.3 and sqlite storage backend
Process completed with exit code 1.
Check with PHP 8.1 and sqlite storage backend
The job was canceled because "_8_2_postgresql" failed.
Check with PHP 8.1 and sqlite storage backend
Process completed with exit code 1.
Check with PHP 8.2 and sqlite storage backend
The job was canceled because "_8_2_postgresql" failed.
Check with PHP 8.2 and sqlite storage backend
The operation was canceled.
Check with PHP 8.2 and mysql storage backend
The job was canceled because "_8_2_postgresql" failed.
Check with PHP 8.2 and mysql storage backend
The operation was canceled.
Check with PHP 8.0 and sqlite storage backend
The job was canceled because "_8_2_postgresql" failed.
Check with PHP 8.0 and sqlite storage backend
The operation was canceled.