[pull] master from erlang:master #4676
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
main.yaml
on: pull_request
Build Erlang/OTP (64-bit)
4m 44s
Event File
2s
Matrix: Test Erlang/OTP
Build Erlang/OTP (macOS)
0s
Build Erlang/OTP (iOS)
0s
Build Erlang/OTP (Windows)
0s
Build Erlang/OTP (Types and Flavors)
0s
Run static analysis
0s
Matrix: Build Erlang/OTP
Test Erlang/OTP (system)
0s
Release Erlang/OTP
0s
Annotations
2 errors
Build Erlang/OTP (64-bit)
Canceling since a higher priority waiting request for 'Build and check Erlang/OTP-refs/pull/91/merge-91' exists
|
Build Erlang/OTP (64-bit)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
Event File
Expired
|
3.63 KB |
|
otp_git_archive
Expired
|
60 MB |
|