Skip to content

Commit

Permalink
Deploying to gh-pages from @ c886e4b 🚀
Browse files Browse the repository at this point in the history
  • Loading branch information
green-br committed Aug 18, 2024
1 parent ab59903 commit b0c3f43
Show file tree
Hide file tree
Showing 3 changed files with 13 additions and 9 deletions.
11 changes: 7 additions & 4 deletions _sources/index.rst.txt
Original file line number Diff line number Diff line change
Expand Up @@ -9,6 +9,9 @@ Isambard User Documentation
Isambard is a HPC service provided by `GW4 <http://gw4.ac.uk>`_ and the `UK Met Office <https://www.metoffice.gov.uk>`_.
The system is funded by `EPSRC <http://www.epsrc.ac.uk>`_ and is one of a number of `Tier-2 HPC facilities <http://www.hpc-uk.ac.uk/facilities/>`_ in the UK.

.. warning::
SERVICE WILL END ON **9AM MONDAY SEPTEMBER 30TH** AND REPLACED BY ISAMBARD 3 - FURTHER INFOMATION TO FOLLOW FOR ISAMBARD 3.

Isambard is a Cray XC50 system which comprises 20,992 cores, and is one of the world's first production Arm-based supercomputers. While Isambard is not based on the more common x86 processors from Intel and AMD, most software compiles and runs on Isambard with no or minimal changes.

Each of the 329 compute nodes contain two 32-core Marvell ThunderX2 processors running at 2.5 GHz. 160 nodes have 256 GB and 169 have 512 GB of memory, both at DDR4-2666MHz.
Expand All @@ -19,14 +22,14 @@ Service Status
--------------------

.. warning::
Since 29 Jul. 2024
Since 18 Aug. 2024

Issue with MACS now fixed.
No known issues.

.. important::
The Isambard 2 service will **shutdown in 2024** (service extended from previous June date to now be after the summer) and be replaced with an entirely new Isambard 3 service. Data management is the *responsibility of the user* therefore we require all important data moved off Isambard 2 before it is shutdown. Support will only be provided for operational issues until the shutdown. Further information will be provided over the coming months.
The Isambard 2 service will **shutdown at 9am on Monday 30th September 2024** and be replaced with an entirely new Isambard 3 service. Data management is the *responsibility of the user* therefore we require all important data moved off Isambard 2 before it is shutdown. Support will only be provided for operational issues until the shutdown. Further information will be provided on Isambard 3 in September.

On Tuesday June 4th 2024 at 9am the "PHASE 3" was switched OFF and was moved to Bristol to be part of Isambard 3 which will be launched over the summer.
On Tuesday June 4th 2024 at 9am the "PHASE 3" was switched OFF and was moved to Bristol to be part of Isambard 3.

System Status
-------------
Expand Down
9 changes: 5 additions & 4 deletions index.html
Original file line number Diff line number Diff line change
Expand Up @@ -117,6 +117,7 @@
<h1>Isambard User Documentation<a class="headerlink" href="#isambard-user-documentation" title="Link to this heading"></a></h1>
<p>Isambard is a HPC service provided by <a class="reference external" href="http://gw4.ac.uk">GW4</a> and the <a class="reference external" href="https://www.metoffice.gov.uk">UK Met Office</a>.
The system is funded by <a class="reference external" href="http://www.epsrc.ac.uk">EPSRC</a> and is one of a number of <a class="reference external" href="http://www.hpc-uk.ac.uk/facilities/">Tier-2 HPC facilities</a> in the UK.</p>
<p>SERVICE WILL END ON <strong>9AM MONDAY SEPTEMBER 30TH</strong> AND REPLACED BY ISAMBARD 3 - FURTHER INFOMATION TO FOLLOW FOR ISAMBARD 3.</p>
<p>Isambard is a Cray XC50 system which comprises 20,992 cores, and is one of the world’s first production Arm-based supercomputers. While Isambard is not based on the more common x86 processors from Intel and AMD, most software compiles and runs on Isambard with no or minimal changes.</p>
<p>Each of the 329 compute nodes contain two 32-core Marvell ThunderX2 processors running at 2.5 GHz. 160 nodes have 256 GB and 169 have 512 GB of memory, both at DDR4-2666MHz.
The nodes are connected via Cray Aries interconnect in a Dragonfly topology.
Expand All @@ -125,13 +126,13 @@ <h1>Isambard User Documentation<a class="headerlink" href="#isambard-user-docume
<h2>Service Status<a class="headerlink" href="#service-status" title="Link to this heading"></a></h2>
<div class="admonition warning">
<p class="admonition-title">Warning</p>
<p>Since 29 Jul. 2024</p>
<p>Issue with MACS now fixed.</p>
<p>Since 18 Aug. 2024</p>
<p>No known issues.</p>
</div>
<div class="admonition important">
<p class="admonition-title">Important</p>
<p>The Isambard 2 service will <strong>shutdown in 2024</strong> (service extended from previous June date to now be after the summer) and be replaced with an entirely new Isambard 3 service. Data management is the <em>responsibility of the user</em> therefore we require all important data moved off Isambard 2 before it is shutdown. Support will only be provided for operational issues until the shutdown. Further information will be provided over the coming months.</p>
<p>On Tuesday June 4th 2024 at 9am the “PHASE 3” was switched OFF and was moved to Bristol to be part of Isambard 3 which will be launched over the summer.</p>
<p>The Isambard 2 service will <strong>shutdown at 9am on Monday 30th September 2024</strong> and be replaced with an entirely new Isambard 3 service. Data management is the <em>responsibility of the user</em> therefore we require all important data moved off Isambard 2 before it is shutdown. Support will only be provided for operational issues until the shutdown. Further information will be provided on Isambard 3 in September.</p>
<p>On Tuesday June 4th 2024 at 9am the “PHASE 3” was switched OFF and was moved to Bristol to be part of Isambard 3.</p>
</div>
</section>
<section id="system-status">
Expand Down
2 changes: 1 addition & 1 deletion searchindex.js

Large diffs are not rendered by default.

0 comments on commit b0c3f43

Please sign in to comment.