CI: Fix weekly tests again #875
testing.yml
on: push
Matrix: lint-and-format
Matrix: typecheck
Matrix: unittests
call-build-documentation
/
parse_commit_info
10s
Matrix: call-build-documentation / build-documentation
build-website
0s
Annotations
7 errors
lint-and-format (3.12)
Process completed with exit code 2.
|
unittests (3.10, lowest-direct)
The run was canceled by @has2k1.
|
unittests (3.10, lowest-direct)
The operation was canceled.
|
call-build-documentation / build-documentation (3.12)
The run was canceled by @has2k1.
|
call-build-documentation / build-documentation (3.12)
The operation was canceled.
|
unittests (3.12, highest)
The run was canceled by @has2k1.
|
unittests (3.12, highest)
The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|