Skip to content

chore(deps-dev): bump eslint-config-oclif from 4.0.0 to 5.2.1 #243

chore(deps-dev): bump eslint-config-oclif from 4.0.0 to 5.2.1

chore(deps-dev): bump eslint-config-oclif from 4.0.0 to 5.2.1 #243

Triggered via push August 19, 2024 18:31
Status Failure
Total duration 28s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (ubuntu-latest, 16.x)
Process completed with exit code 1.
test (windows-latest, 16.x)
The job was canceled because "ubuntu-latest_16_x" failed.
test (windows-latest, 16.x)
The operation was canceled.
test (macos-latest, 16.x)
The job was canceled because "ubuntu-latest_16_x" failed.
test (macos-latest, 16.x)
The operation was canceled.