Skip to content

BPO -> GH issue

BPO -> GH issue #97

Triggered via push October 14, 2024 08:55
Status Failure
Total duration 2h 47m 38s
Artifacts

jit.yml

on: push
Interpreter (Debug)
1h 17m
Interpreter (Debug)
Free-Threaded (Debug)
12m 11s
Free-Threaded (Debug)
Matrix: jit
Fit to window
Zoom out
Zoom in

Annotations

9 errors
x86_64-pc-windows-msvc/msvc (Release)
Process completed with exit code 1.
aarch64-unknown-linux-gnu/gcc (Release)
Process completed with exit code 2.
aarch64-unknown-linux-gnu/clang (Release)
Process completed with exit code 2.
aarch64-unknown-linux-gnu/clang (Debug)
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 90 minutes.
aarch64-unknown-linux-gnu/clang (Debug)
The operation was canceled.
x86_64-unknown-linux-gnu/gcc (Release)
The job running on runner GitHub Actions 14 has exceeded the maximum execution time of 90 minutes.
x86_64-unknown-linux-gnu/gcc (Release)
The operation was canceled.
aarch64-unknown-linux-gnu/gcc (Debug)
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 90 minutes.
aarch64-unknown-linux-gnu/gcc (Debug)
The operation was canceled.