Skip to content

Release commit v2.5.11 #3933

Release commit v2.5.11

Release commit v2.5.11 #3933

Triggered via pull request January 27, 2025 17:26
Status Success
Total duration 19m 36s
Billable time 1h 50m
Artifacts

verify-build.yml

on: pull_request
Matrix: Integration Tests
Fit to window
Zoom out
Zoom in

Annotations

11 warnings
Basic Checks
The process '/bin/git' failed with exit code 128
Integration Tests (pvtdatapurge)
The process '/bin/git' failed with exit code 128
Integration Tests (gateway idemix pkcs11 configtx configtxlator)
The process '/bin/git' failed with exit code 128
Unit Tests
The process '/bin/git' failed with exit code 128
Integration Tests (e2e)
The process '/bin/git' failed with exit code 128
Integration Tests (discovery gossip devmode pluggable)
The process '/bin/git' failed with exit code 128
Integration Tests (sbe nwo msp)
The process '/bin/git' failed with exit code 128
Integration Tests (lifecycle)
The process '/bin/git' failed with exit code 128
Integration Tests (ledger)
The process '/bin/git' failed with exit code 128
Integration Tests (raft)
The process '/bin/git' failed with exit code 128
Integration Tests (pvtdata)
The process '/bin/git' failed with exit code 128