Skip to content

m-to-n restart (new) #8880

m-to-n restart (new)

m-to-n restart (new) #8880

Triggered via pull request August 27, 2024 20:40
Status Failure
Total duration 1h 44m 36s
Artifacts

ci.yaml

on: pull_request
Matrix: Emirge installation
Matrix: Examples
Matrix: Production testing
Fit to window
Zoom out
Zoom in

Annotations

15 errors
Flake8
Process completed with exit code 1.
Pylint
Process completed with exit code 2.
Emirge installation (ubuntu-latest)
Process completed with exit code 1.
Emirge installation (macos-latest)
The job was canceled because "ubuntu-latest" failed.
Emirge installation (macos-latest)
The operation was canceled.
Documentation
Process completed with exit code 2.
Examples (ubuntu-latest)
Process completed with exit code 1.
Examples (porter)
The job was canceled because "ubuntu-latest" failed.
Examples (porter)
The operation was canceled.
Production testing (ubuntu-latest)
Process completed with exit code 1.
Production testing (porter)
The job was canceled because "ubuntu-latest" failed.
Production testing (porter)
The operation was canceled.
Production testing (macos-latest)
The job was canceled because "ubuntu-latest" failed.
Production testing (macos-latest)
The operation was canceled.
Pytest
Process completed with exit code 1.