Merge pull request #1084 from input-output-hk/jpraynaud/918-update-ma… #3851
ci.yml
on: push
publish-tests-results
0s
Matrix: run-test-lab
Matrix: docker-mithril
unstable-release
0s
Matrix: deploy-testing
Annotations
5 errors
build (windows-latest)
The operation was canceled.
|
build-ubuntu-X64
The operation was canceled.
|
test (ubuntu-22.04)
Canceling since a higher priority waiting request for 'ci-build-test-refs/heads/main' exists
|
test (ubuntu-22.04)
The operation was canceled.
|
test (windows-latest)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
mithril-distribution-macOS-X64
Expired
|
8.95 MB |
|
test-results-macOS-X64
Expired
|
3.85 KB |
|