Skip to content

chore(deps): update linters (major) #2198

chore(deps): update linters (major)

chore(deps): update linters (major) #2198

Triggered via pull request December 9, 2024 03:41
Status Failure
Total duration 19m 42s
Artifacts

test.yml

on: pull_request
Matrix: test_matrix
required_check
0s
required_check
Fit to window
Zoom out
Zoom in

Annotations

18 errors and 2 warnings
test_matrix (ubuntu-latest, 20)
Process completed with exit code 2.
test_matrix (ubuntu-latest, 21)
The job was canceled because "ubuntu-latest_20" failed.
test_matrix (ubuntu-latest, 21)
Process completed with exit code 2.
test_matrix (macos-latest, 18)
The job was canceled because "ubuntu-latest_20" failed.
test_matrix (macos-latest, 18)
Process completed with exit code 2.
test_matrix (windows-latest, 21)
The job was canceled because "ubuntu-latest_20" failed.
test_matrix (windows-latest, 21)
The operation was canceled.
test_matrix (macos-latest, 20)
The job was canceled because "ubuntu-latest_20" failed.
test_matrix (macos-latest, 20)
Process completed with exit code 2.
test_matrix (windows-latest, 20)
The job was canceled because "ubuntu-latest_20" failed.
test_matrix (windows-latest, 20)
The operation was canceled.
test_matrix (windows-latest, 18)
The job was canceled because "ubuntu-latest_20" failed.
test_matrix (windows-latest, 18)
The operation was canceled.
test_matrix (ubuntu-latest, 18)
The job was canceled because "ubuntu-latest_20" failed.
test_matrix (ubuntu-latest, 18)
The operation was canceled.
test_matrix (macos-latest, 21)
The job was canceled because "ubuntu-latest_20" failed.
test_matrix (macos-latest, 21)
The operation was canceled.
required_check
Process completed with exit code 1.
test_matrix (ubuntu-latest, 20)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
required_check
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636