Skip to content

Releases: jacklovell/bolodsp-doc

Add TWAIT description

04 Sep 15:13
Compare
Choose a tag to compare
1.3.3

Add section documenting TWAIT knob

Move example calibration trace figures

20 Dec 09:58
Compare
Choose a tag to compare
1.3.2

Place example calibration traces immediately after the end of the sec…

Update contact email address

13 Dec 12:52
Compare
Choose a tag to compare
1.3.1

Update contact email address

Include examples of a successful calibration

10 Oct 14:20
Compare
Choose a tag to compare

This release includes 3 screen shots of Control System Studio showing the transient capture plots for the 3 logical channels in calibration: the amplitude, phase and voltage+current. This is to give users an idea of what to expect when running the calibration, if they are not very familiar with resistive bolometers.

Fix calibration explanation and calculation

23 Mar 15:28
Compare
Choose a tag to compare
Change figures to SVG with Latex included, rather than EPS.

Inkscape works much better with SVG than EPS for me, and can use
embedded Latex commands to export a PDF/Latex figure. Use the
included svg_to_pdf_tex.sh script to convert the SVGs for inclusion
into the Latex source, and compile the document with pdflatex.

Add calibfit section

16 Dec 17:16
Compare
Choose a tag to compare

This release includes a section of the new calibfit utility, which can automatically calculate bolometer sensor calibration constants for a given channel. This is useful when running a calibration just before a shot, if you want the calibration results to be used in the shot itself.

First release

12 Dec 11:52
Compare
Choose a tag to compare

First release of software documentation's pre-built PDF.