Skip to content

upgrade to go 1.23 #1391

upgrade to go 1.23

upgrade to go 1.23 #1391

Re-run triggered November 4, 2024 09:52
Status Failure
Total duration 2m 49s
Artifacts 6

pd-tests.yaml

on: pull_request
Matrix: chunks
report-coverage
0s
report-coverage
Fit to window
Zoom out
Zoom in

Annotations

7 errors
chunks (6)
Process completed with exit code 2.
chunks (2)
The job was canceled because "_6" failed.
chunks (2)
The operation was canceled.
chunks (5)
The job was canceled because "_6" failed.
chunks (5)
The operation was canceled.
chunks (10)
The job was canceled because "_6" failed.
chunks (10)
The operation was canceled.