Test nagfor #735
test_nagfor.yml
on: schedule
Matrix: Run nagfor tests
check_success_timeout
9s
Annotations
6 errors and 1 warning
Run nagfor tests (i2, bobyqa, big)
The job running on runner zM1 has exceeded the maximum execution time of 360 minutes.
|
Run nagfor tests (i2, bobyqa, big)
The operation was canceled.
|
Run nagfor tests (i2, lincoa, big)
The job running on runner zM1 has exceeded the maximum execution time of 360 minutes.
|
Run nagfor tests (i2, lincoa, big)
The operation was canceled.
|
Run nagfor tests (i2, newuoa, big)
The job running on runner zM0 has exceeded the maximum execution time of 360 minutes.
|
Run nagfor tests (i2, newuoa, big)
The operation was canceled.
|
check_success_timeout
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
bobyqa-i2-big--g
|
10.6 KB |
|
bobyqa-i2-small--g
|
75.5 KB |
|
cobyla-i2-big--g
|
119 KB |
|
cobyla-i2-small--g
|
250 KB |
|
lincoa-i2-big--g
|
214 KB |
|
lincoa-i2-small--g
|
375 KB |
|
newuoa-i2-big--g
|
10.8 KB |
|
newuoa-i2-small--g
|
68.8 KB |
|
uobyqa-i2-big--g
|
3.98 KB |
|
uobyqa-i2-small--g
|
58.2 KB |
|