Upgrade bech32 dependency (iterative) #15341
Triggered via pull request
September 10, 2024 09:21
Status
Failure
Total duration
6h 0m 44s
Artifacts
–
build.yml
on: pull_request
coverage
6m 28s
benchmark
33m 27s
check_commits
16m 58s
check_release
2m 15s
fuzz
1h 34m
linting
1m 3s
rustfmt
15s
incremental-mutants
9m 37s
Matrix: build
Annotations
7 errors
linting
Process completed with exit code 101.
|
incremental-mutants
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
incremental-mutants
The operation was canceled.
|
build (windows-latest, beta)
Process completed with exit code 101.
|
build (windows-latest, stable)
Process completed with exit code 101.
|
build (windows-latest, 1.63.0)
The job running on runner GitHub Actions 13 has exceeded the maximum execution time of 360 minutes.
|
build (windows-latest, 1.63.0)
The operation was canceled.
|