Upgrade bech32 dependency (iterative) #15367
Triggered via pull request
September 11, 2024 20:38
Status
Failure
Total duration
11h 8m 16s
Artifacts
–
build.yml
on: pull_request
coverage
6m 22s
benchmark
34m 18s
check_commits
4m 44s
check_release
2m 35s
fuzz
1h 30m
linting
1m 28s
rustfmt
13s
incremental-mutants
13m 57s
Matrix: build
Annotations
6 errors
linting
Process completed with exit code 101.
|
rustfmt
Process completed with exit code 1.
|
incremental-mutants
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
incremental-mutants
The operation was canceled.
|
build (windows-latest, 1.63.0)
The job running on runner GitHub Actions 12 has exceeded the maximum execution time of 360 minutes.
|
build (windows-latest, 1.63.0)
The operation was canceled.
|