Fix builds of lightning-rapid-gossip-sync
and lightning-background-processor
crates
#15400
Triggered via pull request
September 16, 2024 07:01
Status
Cancelled
Total duration
1h 31m 22s
Artifacts
–
build.yml
on: pull_request
coverage
6m 14s
benchmark
17m 47s
check_commits
6m 1s
check_release
1m 49s
fuzz
1h 26m
linting
55s
rustfmt
12s
incremental-mutants
13m 19s
Matrix: build
Annotations
12 errors
linting
Process completed with exit code 101.
|
build (macos-latest, 1.63.0)
Process completed with exit code 101.
|
build (ubuntu-latest, 1.63.0)
Process completed with exit code 101.
|
check_commits
Process completed with exit code 1.
|
build (macos-latest, beta)
Process completed with exit code 101.
|
build (macos-latest, stable)
Process completed with exit code 101.
|
build (ubuntu-latest, beta)
Process completed with exit code 101.
|
build (ubuntu-latest, stable)
Process completed with exit code 101.
|
build (windows-latest, beta)
Process completed with exit code 101.
|
build (windows-latest, stable)
Process completed with exit code 101.
|
build (windows-latest, 1.63.0)
Canceling since a higher priority waiting request for 'Continuous Integration Checks-refs/pull/3289/merge' exists
|
build (windows-latest, 1.63.0)
The operation was canceled.
|