Fix builds of lightning-rapid-gossip-sync
and lightning-background-processor
crates
#15402
Triggered via pull request
September 16, 2024 08:37
Status
Failure
Total duration
6h 1m 22s
Artifacts
–
build.yml
on: pull_request
coverage
6m 10s
benchmark
19m 39s
check_commits
5m 14s
check_release
2m 0s
fuzz
1h 25m
linting
1m 2s
rustfmt
14s
incremental-mutants
13m 13s
Matrix: build
Annotations
12 errors
linting
Process completed with exit code 101.
|
check_commits
Process completed with exit code 1.
|
build (macos-latest, beta)
Process completed with exit code 101.
|
build (ubuntu-latest, beta)
Process completed with exit code 101.
|
build (ubuntu-latest, stable)
Process completed with exit code 101.
|
build (macos-latest, 1.63.0)
Process completed with exit code 101.
|
build (macos-latest, stable)
Process completed with exit code 101.
|
build (ubuntu-latest, 1.63.0)
Process completed with exit code 101.
|
build (windows-latest, beta)
Process completed with exit code 101.
|
build (windows-latest, stable)
Process completed with exit code 101.
|
build (windows-latest, 1.63.0)
The job running on runner GitHub Actions 14 has exceeded the maximum execution time of 360 minutes.
|
build (windows-latest, 1.63.0)
The operation was canceled.
|