Skip to content

Merge pull request #3289 from tnull/2024-09-fix-rgs-bp-builds #15448

Merge pull request #3289 from tnull/2024-09-fix-rgs-bp-builds

Merge pull request #3289 from tnull/2024-09-fix-rgs-bp-builds #15448

Triggered via push September 18, 2024 14:31
Status Failure
Total duration 6h 1m 44s
Artifacts

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

3 errors
linting
Process completed with exit code 101.
build (windows-latest, 1.63.0)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 360 minutes.
build (windows-latest, 1.63.0)
The operation was canceled.