Initial draft. #1
Changes from all commits
File filter
Filter by extension
Conversations
Jump to
Diff view
Diff view
There are no files selected for viewing
Original file line number | Diff line number | Diff line change |
---|---|---|
|
@@ -4,9 +4,136 @@ Night Planning Tool | |
|
||
.. abstract:: | ||
|
||
This technote describes the design of an integrated night planning tool. This is a tools that allows our team to collect a group of Jira tickets that describes a set of tests, allows us to organize these into a coherent list of tests to execute, that can later be loaded and executed at the summit. | ||
This technote describes the design of an integrated night planning tool. | ||
This is a tool that allows our team to collect a group of Jira tickets describing a set of tests/observations. | ||
It will also help us organize these into a coherent list that can later be loaded and executed at the summit. | ||
|
||
Add content here | ||
================ | ||
Introduction | ||
============ | ||
|
||
Test planning and execution for commissioning the Vera Rubin observatory has revolved around using Jira and Confluence to generate a comprehensive plan that can be followed by the night crew. | ||
This process involves a combination of Jira projects: | ||
|
||
- SITCOM are used to capture high level tests/verification activities. | ||
They are usually connected to one or more requirement or some other commissioning activity. | ||
For example, `SITCOM-1099`_ was created to capture the tests required to validate the operation of the system with the TMA dynamic settings going from 5% all the way to 100% of its requirements. | ||
|
||
- DM tickets are used to capture work needed either by a regular contruction deliverable or a commissioning activity. | ||
DM tickets can be linked to SITCOM tickets when there is work required to accomplish a particular test, but they can also be standalone ticket that are just broadly required. | ||
For instance, in the example above of `SITCOM-1099`_, we have `DM-39533`_ linked as a related ticket. | ||
It is not strickly necessary to have this relantionship as `DM-39533`_ represents a broader system functionality, however the issues are linked to demonstrate the relantionship. | ||
Sometimes a SITCOM ticket might trigger the development of systewide functionality and the relantionship is used to indicate it. | ||
|
||
- BLOCK tickets are used to design, plan, execute and track activities at the summit. | ||
Usually a BLOCK ticket will be linked to a SITCOM ticket. | ||
|
||
.. _SITCOM-1099: https://rubinobs.atlassian.net/browse/SITCOM-1099 | ||
.. _DM-39533: https://rubinobs.atlassian.net/browse/DM-39533 | ||
|
||
Up to now, planning activities at the summit have revolved around collecting the BLOCK tickets that will be executed at night and sorting them out in a table with some information about priority and order of execution. | ||
`This page <https://confluence.lsstcorp.org/display/LSSTCOM/2024-04-23+Simonyi+Night+Log>`__ contains the plan for the night of 2024-04-23. | ||
|
||
Later, the summit crew adds information to these tables about the execution and are also required to do more detailed logging in LOVE/OLE. | ||
Gathering information later about task execution and performing traceability under these conditions is taxing. | ||
Users have to peruse the night logs for detailed information and also check the confluence page with the night plan. | ||
|
||
In order to improve overal user experience on both sides of the isle; creating and executing the plan, and also to improve metadata extraction for traceability, we propose to introduce a set of new procedures and tools for planning and execution of the summit activities. | ||
|
||
Planning with Zephyr | ||
==================== | ||
|
||
We will adopt Jira's Zephyr application to create test cases, test cycles and test plans to organize how tests will be executed and planned. | ||
|
||
- BLOCK tickets will be used to describe what the block does, link it to a particular SITCOM ticket and will also aggregate the block configuration. | ||
There was a problem hiding this comment. Choose a reason for hiding this commentThe reason will be displayed to describe this comment to others. Learn more. If we adopt Zephyr, I recommend that we limit BLOCK tickets for those who will have JSON files or scheduler configurations. I don't see why we need to create a BLOCK ticket and a test case if that does not favor automatization/scripting. There was a problem hiding this comment. Choose a reason for hiding this commentThe reason will be displayed to describe this comment to others. Learn more. I am not sure about this. For example, see the doc page that Erik is working on describing the BLOCK project workflow. I think there is some value to having a BLOCK ticket. However, this might be a good discussion to have with the rest of the team. There was a problem hiding this comment. Choose a reason for hiding this commentThe reason will be displayed to describe this comment to others. Learn more. Can we have a couple of examples here? I believe, the way this is now, it is too abstract for a discussion. There was a problem hiding this comment. Choose a reason for hiding this commentThe reason will be displayed to describe this comment to others. Learn more. I think Erik's document would be a better place for this information. I am going to link Erik's document here and will add an item in the FAQ to talk about this. |
||
|
||
See the :external+obsops:ref:`BLOCK project workflow <BLOCK-Jira-Workflow>` documentation for more information. | ||
|
||
- Test Cases will have a step by step description of how to execute a particular BLOCK. | ||
There was a problem hiding this comment. Choose a reason for hiding this commentThe reason will be displayed to describe this comment to others. Learn more. Including instructions to setup/wrap-up. |
||
Including instructions to setup/wrap-up. | ||
|
||
- Test Cycles will be used to plan a particular night. | ||
They contain a list of Test Cases, ordered in the same way they should be executed. | ||
The Environment field is used to separate the Test Cases that will be executed at different parts of the day; Daytime, Afternoon, Early Night, Late Night, etc. | ||
There was a problem hiding this comment. Choose a reason for hiding this commentThe reason will be displayed to describe this comment to others. Learn more. The time periods are something that I would like to agree on and have it set in stone. There was a problem hiding this comment. Choose a reason for hiding this commentThe reason will be displayed to describe this comment to others. Learn more. agree... let's discuss that in the next meeting. |
||
|
||
- Test Execution are created for each Test Case to track a particular execution. | ||
|
||
- Test Plans contains a collection of Test Cycles and are used for long term planning. | ||
|
||
.. figure:: /_static/test_cycle.png | ||
:name: fig-test-cycle | ||
:target: ../images/test_cycle.png | ||
:alt: Test Cycle | ||
|
||
An example Test Cycle showing the planned Test Executions for the Test Cases scheduled for a particular night. | ||
The Test Executions are sorted in the order they should be executed, sub-divided in two different parts of the day; Late Afternoon and Early Night. | ||
|
||
Integration with LOVE | ||
===================== | ||
|
||
As an initial fallback mode, we expect the summit crew would be able to interact directly with the Test Cycle in Jira to execute a night plan. | ||
However we have the potential to considerably improve the user experience by integrating the Test Cycle with LOVE. | ||
|
||
The idea would be to provide an interface in LOVE similar to that of the Jira Test Player. | ||
Through this interface users would be able to: | ||
|
||
- Select the plan for the night. | ||
|
||
This could be a drop down menu that shows the list of Test Cycles from Jira. | ||
|
||
Uppon selection of a particular Test Cycle, users would be presented with the list of Test Executions, ordered like they appear in the Test Cycle. | ||
|
||
- Select a Test Execution from the night plan. | ||
|
||
This would present the users with the Test Player interface, showing information about the particular tests and the steps that need to be executed. | ||
|
||
- Start and run a Test Execution. | ||
|
||
If the test steps are correctly configured with the required script information, users will be able to send these to the ScriptQueue directly from the test step. | ||
The test step will also monitor the relevant information and back feed that into the Test Execution. | ||
This means that, if a block fails to execute, the test step will be marked as failed. | ||
|
||
- Log information from a step execution and or the Test Execution. | ||
|
||
Each step in the Test Execution will also have an input text box that can be used to log entries in OLE. | ||
The system should use metadata provided in the Test Execution to augment the narrative log entry with additional labels, etc. | ||
|
||
The high level Test Execution will also have an input text box to create log entries. | ||
|
||
- Feed the information back to Jira. | ||
|
||
All metadata generated at the summit by this tool will be fed back to jira to allow for better traceability. | ||
|
||
FAQ | ||
=== | ||
|
||
.. note:: | ||
|
||
This session is to capture any discussion points made while reviewing this document. | ||
Things here can be deleted afterwards if incorporated to the document or kept for historical reasons. | ||
|
||
- On the relantionship between BLOCK tickets and Test Cases: | ||
|
||
- Do we need BLOCK tickets if we have Test Cases? | ||
|
||
- Should we always have a BLOCK ticket associated with a Test Case? | ||
|
||
- What information should go on a BLOCK ticket and what should go in the Test Case? | ||
|
||
- What are the values for the "Environment" field we should adopt and how are we going to use it? | ||
|
||
Current suggestion is to use it as a "time block aggregator" with the following values: | ||
|
||
- Time Critical | ||
|
||
- Daytime | ||
|
||
- Late Afternoon | ||
|
||
- Early Night | ||
|
||
- Mid Night | ||
|
||
- Late Night | ||
|
||
- End Night | ||
|
||
See the `Documenteer documentation <https://documenteer.lsst.io/technotes/index.html>`_ for tips on how to write and configure your new technote. |
There was a problem hiding this comment.
Choose a reason for hiding this comment
The reason will be displayed to describe this comment to others. Learn more.
Maybe add a link to one of the night plans/logs for a practical example? Here is one for convenience:
https://confluence.lsstcorp.org/display/LSSTCOM/2024-04-23+Simonyi+Night+Log