fix(deps): update all patch and minor #1044
Annotations
9 errors
test (ubuntu-24.04):
pkg/controller/garbage_collector.go#L162
calculated cyclomatic complexity for function GarbageCollectRefs is 21, max is 20 (cyclop)
|
test (ubuntu-24.04):
pkg/controller/garbage_collector.go#L259
calculated cyclomatic complexity for function GarbageCollectMetrics is 29, max is 20 (cyclop)
|
test (ubuntu-24.04):
pkg/controller/pipelines.go#L16
calculated cyclomatic complexity for function PullRefMetrics is 22, max is 20 (cyclop)
|
test (ubuntu-24.04):
pkg/gitlab/pipelines.go#L147
calculated cyclomatic complexity for function GetRefsFromPipelines is 25, max is 20 (cyclop)
|
test (ubuntu-24.04)
Process completed with exit code 2.
|
test (windows-2022)
The job was canceled because "ubuntu-24_04" failed.
|
test (windows-2022)
The operation was canceled.
|
test (macos-13)
The job was canceled because "ubuntu-24_04" failed.
|
test (macos-13)
The operation was canceled.
|