Skip to content

Integration mysql

Integration mysql #911

Triggered via schedule November 19, 2024 02:58
Status Failure
Total duration 11m 38s
Artifacts

integration-mysql.yml

on: schedule
changes
8s
changes
Matrix: integration-mysql
integration-mysql-summary
5s
integration-mysql-summary
Fit to window
Zoom out
Zoom in

Annotations

11 errors
changes
The process '/usr/bin/git' failed with exit code 128
integration-mysql (conversation-1, 8.2, master, master, master, main, master)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
integration-mysql (chat-2, 8.2, master, master, master, main, master)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
integration-mysql (chat-2, 8.2, master, master, master, main, master)
The operation was canceled.
integration-mysql (conversation-5, 8.2, master, master, master, main, master)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
integration-mysql (conversation-3, 8.2, master, master, master, main, master)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
integration-mysql (callapi, 8.2, master, master, master, main, master)
Process completed with exit code 1.
integration-mysql-summary
Process completed with exit code 1.