Skip to content

chore(deps): Bump cachix/install-nix-action from V28 to 29 (#507) #910

chore(deps): Bump cachix/install-nix-action from V28 to 29 (#507)

chore(deps): Bump cachix/install-nix-action from V28 to 29 (#507) #910

Triggered via push September 30, 2024 14:40
Status Failure
Total duration 4m 27s
Artifacts

main.yml

on: push
Matrix: Build
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Build (ubuntu-latest, 4.14)
Process completed with exit code 1.
Build (windows-latest, 4.14)
The job was canceled because "ubuntu-latest_4_14" failed.
Build (windows-latest, 4.14)
The operation was canceled.
Build (windows-latest, 5.2)
The job was canceled because "ubuntu-latest_4_14" failed.
Build (windows-latest, 5.2)
The operation was canceled.
Build (ubuntu-latest, 5.2)
The job was canceled because "ubuntu-latest_4_14" failed.
Build (ubuntu-latest, 5.2)
The operation was canceled.
Build (macos-latest, 5.2)
The job was canceled because "ubuntu-latest_4_14" failed.
Build (macos-latest, 5.2)
The operation was canceled.
Build (macos-latest, 4.14)
The job was canceled because "ubuntu-latest_4_14" failed.
Build (macos-latest, 4.14)
The operation was canceled.