Skip to content

chore: bump github.com/prometheus/client_golang from 1.19.0 to 1.19.1 #151

chore: bump github.com/prometheus/client_golang from 1.19.0 to 1.19.1

chore: bump github.com/prometheus/client_golang from 1.19.0 to 1.19.1 #151

Triggered via pull request May 17, 2024 02:54
Status Failure
Total duration 5m 23s
Artifacts

test-gator.yaml

on: pull_request
Matrix: Test Gator
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 4 warnings
Test Gator (1.26.3)
The job running on runner GitHub Actions 56 has exceeded the maximum execution time of 5 minutes.
Test Gator (1.26.3)
The operation was canceled.
Test Gator (1.26.3)
Failed to download action 'https://api.github.com/repos/step-security/harden-runner/tarball/63c24ba6bd7ba022e95695ff85de572c04a18142'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
Test Gator (1.26.3)
Back off 15.4 seconds before retry.
Test Gator (1.26.3)
Failed to download action 'https://api.github.com/repos/step-security/harden-runner/tarball/63c24ba6bd7ba022e95695ff85de572c04a18142'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
Test Gator (1.26.3)
Back off 23.78 seconds before retry.