Skip to content

Pull requests: openshift/cluster-node-tuning-operator

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

Switch builder image to multi-arch image approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#1297 opened Feb 16, 2025 by rbaturov Loading…
CNF-16742: kernelPageSize + hugepages combinations validation jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1296 opened Feb 16, 2025 by rbaturov Loading…
OCPBUGS-49823: machineconfig: add support for various hugepage sizes approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#1295 opened Feb 13, 2025 by rbaturov Loading…
OCPBUGS-49823: Support hugepage size selection for ARM-based clusters approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#1294 opened Feb 5, 2025 by rbaturov Loading…
OCPBUGS-49403: E2E: Add configuration tests related to align cpus by uncorecache feature approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#1291 opened Jan 24, 2025 by mrniranjan Loading…
e2e:daemonset: pod phase and events acknowledge-critical-fixes-only Indicates if the issuer of the label is OK with the policy. approved Indicates a PR has been approved by an approver from all required OWNERS files.
#1289 opened Jan 22, 2025 by Tal-or Loading…
CNF-16459: Update cnf-tests image approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1286 opened Jan 20, 2025 by rbaturov Loading…
perfprof: add enablement annotation approved Indicates a PR has been approved by an approver from all required OWNERS files.
#1278 opened Jan 9, 2025 by ffromani Loading…
PPC: verify core with the same ID always has same sibling list and add missing test needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1235 opened Dec 3, 2024 by shajmakh Loading…
[TEST/DONT-MERGE]test different cores
#1228 opened Nov 27, 2024 by shajmakh Loading…
WIP: Use the new IRQBALANCE_BANNED_CPULIST variable approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#1227 opened Nov 26, 2024 by MarSik Loading…
WIP: PPC: remove ProcessorCore.Index instances do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#1225 opened Nov 26, 2024 by shajmakh Loading…
WIP: PPC: unit: test sortTopology for expected output do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#1217 opened Nov 14, 2024 by shajmakh Loading…
OCPBUGS-44559: Manage TuneD profiles with the same name and different content approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1216 opened Nov 14, 2024 by jmencak Loading…
OCPBUGS-35911: E2E: Add test to verify runc process excludes the cpus used by pod. approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#1088 opened Jun 21, 2024 by SargunNarula Loading…
NO-JIRA: Stop exposing the entire host filesystem approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lifecycle/stale Denotes an issue or PR has remained open with no activity and has become stale. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1085 opened Jun 11, 2024 by jmencak Loading…
OCPBUGS-25860: Disable managed interrupts for smartpqi approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/severity-important Referenced Jira bug's severity is important for the branch this PR is targeting. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#915 opened Jan 12, 2024 by MarSik Loading…
ProTip! Type g p on any issue or pull request to go back to the pull request listing page.