fix: fix proto package #20
Draft
Travis CI / Travis CI - Pull Request
failed
Nov 26, 2024 in 2m 9s
Build Failed
The build failed, just like the previous build.
Details
This is a pull request build.
It is running a build against the merge commit, after merging #20 fix: fix proto package.
Any changes that have been made to the main branch before the build ran are also included.
Jobs and Stages
This build only has a single job.
You can use jobs to test against multiple versions of your runtime or dependencies, or to speed up your build.
Build Configuration
Build Option | Setting |
---|---|
Language | Go |
Operating System | Linux (Focal) |
Go Version | 1.18.x |
Build Configuration
{
"language": "go",
"os": [
"linux"
],
"dist": "focal",
"sudo": true,
"go": [
"1.18.x"
],
"before_install": [
],
"script": [
"echo "${DOCKER_PASSWORD}" | docker login -u "${DOCKER_USER}" --password-stdin\nif [ "${TRAVIS_BRANCH}" == "main" ]; then\n export DOCKER_HUB_PX_OBJECT_CONTROLLER_TEST_TAG=main\nelse\n export DOCKER_HUB_PX_OBJECT_CONTROLLER_TEST_TAG=git rev-parse --short HEAD\nfi\nexport DOCKER_HUB_PX_OBJECT_CONTROLLER_TAG=${TRAVIS_BRANCH}-git rev-parse --short HEAD\nmake all test container setup-travis integration-test-suite &&\nif [ "${TRAVIS_PULL_REQUEST}" == "false" ]; then\n make deploy;\nfi\n"
],
"notifications": {
"email": [
{
"on_success": "always",
"on_failure": "always"
}
]
}
}
Loading