Skip to content

Fix instance reload #611

Fix instance reload

Fix instance reload #611

Triggered via pull request April 3, 2024 17:59
Status Failure
Total duration 3h 9m 31s
Artifacts

ci.yml

on: pull_request
Spec  /  Setup Test Matrix
28s
Spec / Setup Test Matrix
Matrix: Spec / spec
Acceptance  /  Setup Test Matrix
23s
Acceptance / Setup Test Matrix
Matrix: Acceptance / acceptance
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Acceptance / Acceptance tests (RedHat-8, puppet7-nightly)
Process completed with exit code 1.
Acceptance / Acceptance tests (CentOS-8, puppet7-nightly)
Process completed with exit code 1.
Acceptance / Acceptance tests (AlmaLinux-8, puppet8-nightly)
The job running on runner GitHub Actions 87 has exceeded the maximum execution time of 180 minutes.
Acceptance / Acceptance tests (AlmaLinux-8, puppet8-nightly)
The operation was canceled.
Acceptance / Acceptance tests (Rocky-8, puppet8-nightly)
The job running on runner GitHub Actions 328 has exceeded the maximum execution time of 180 minutes.
Acceptance / Acceptance tests (Rocky-8, puppet8-nightly)
The operation was canceled.
Acceptance / Acceptance tests (AlmaLinux-8, puppet7-nightly)
The job running on runner GitHub Actions 315 has exceeded the maximum execution time of 180 minutes.
Acceptance / Acceptance tests (AlmaLinux-8, puppet7-nightly)
The operation was canceled.
Acceptance / Acceptance tests (Rocky-8, puppet7-nightly)
The job running on runner GitHub Actions 497 has exceeded the maximum execution time of 180 minutes.
Acceptance / Acceptance tests (Rocky-8, puppet7-nightly)
The operation was canceled.