Skip to content

Commit

Permalink
Update Tutorial.md
Browse files Browse the repository at this point in the history
  • Loading branch information
rodoulak authored Oct 20, 2024
1 parent 8947f71 commit fdcf79d
Showing 1 changed file with 4 additions and 0 deletions.
4 changes: 4 additions & 0 deletions Tutorials/Tutorial.md
Original file line number Diff line number Diff line change
Expand Up @@ -121,6 +121,10 @@ For the economic analysis of a full-scale desalination plant, the equipment cost
| | Plant overhead costs: 5% of annual OPEX |


> [!NOTE]
> Note that the assumptions listed in **Table 3** can be modified to suit different case studies.

### 6. Treatment trains comparison
In comparison file, results from different treatment trains are summarised. Indicators are formulated to compare the treatment trains.

Expand Down

0 comments on commit fdcf79d

Please sign in to comment.