Skip to content
Triggered via merge group July 28, 2023 18:17
Status Failure
Total duration 1m 21s
Artifacts

main.yml

on: merge_group
Matrix: Test
Rustfmt
9s
Rustfmt
Success gate
0s
Success gate
Failure gate
0s
Failure gate
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Test (nightly)
Process completed with exit code 101.
Test (beta)
The job was canceled because "nightly" failed.
Test (beta)
Process completed with exit code 101.
Test (windows)
The job was canceled because "nightly" failed.
Test (windows)
The operation was canceled.
Test (stable)
The job was canceled because "nightly" failed.
Test (stable)
The operation was canceled.
Test (macos)
The job was canceled because "nightly" failed.
Test (macos)
The operation was canceled.
Failure gate
Process completed with exit code 1.