chore: bump github.com/PuerkitoBio/goquery from 1.10.0 to 1.10.1 #213
pr_test-matrix.yml
on: pull_request
Matrix: linux-matrix
Matrix: windows-matrix
Annotations
6 errors and 1 warning
linux-matrix (1.23, ubuntu-latest)
Process completed with exit code 1.
|
linux-matrix (1.22, ubuntu-latest)
The job was canceled because "_1_23_ubuntu-latest" failed.
|
linux-matrix (1.22, ubuntu-latest)
The operation was canceled.
|
windows-matrix (1.22, windows-latest)
Process completed with exit code 1.
|
windows-matrix (1.23, windows-latest)
The job was canceled because "_1_22_windows-latest" failed.
|
windows-matrix (1.23, windows-latest)
The operation was canceled.
|
linux-matrix (1.23, ubuntu-latest)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|