You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Our current test suite that runs for every PR takes about 10-15 min. It doesn't need to be the case that all tests should be run for every change, though. It would be nice to separate out unit and integration tests, where unit tests run for every change and integration tests run on a schedule or on dispatch.
The text was updated successfully, but these errors were encountered:
Our current test suite that runs for every PR takes about 10-15 min. It doesn't need to be the case that all tests should be run for every change, though. It would be nice to separate out unit and integration tests, where unit tests run for every change and integration tests run on a schedule or on dispatch.
The text was updated successfully, but these errors were encountered: