Merge pull request #1404 from yankeexe/fix-typo #5821
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
go.yaml
on: push
Build images
4m 45s
Verify
4m 9s
Verify dependencies
39s
Build and test
6m 25s
Build Helm charts
15s
Verify vendorability
0s
Test e2e parallel
1h 5m
Test e2e serial
25m 14s
Test e2e parallel (with alpha features)
1h 10m
Test e2e serial (with alpha features)
25m 6s
Failure notifications
1s
Annotations
1 error
Test e2e parallel (with alpha features)
The hosted runner: GitHub Actions 6 lost communication with the server. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
e2e-artifacts-parallel.tar.lz4
Expired
|
30.8 MB |
|
e2e-artifacts-serial-alpha.tar.lz4
Expired
|
8.64 MB |
|
e2e-artifacts-serial.tar.lz4
Expired
|
8.35 MB |
|
helm-charts.zip
Expired
|
133 KB |
|
operatorimage.tar.lz4
Expired
|
118 MB |
|