Skip to content

Modify flow for connectivity check #41

Modify flow for connectivity check

Modify flow for connectivity check #41

Triggered via push January 7, 2025 01:45
Status Failure
Total duration 52s
Artifacts

sanitizers.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build (THREAD_SANITIZER)
Process completed with exit code 2.
build (ADDRESS_SANITIZER)
Process completed with exit code 2.
build (MEMORY_SANITIZER)
The job was canceled because "THREAD_SANITIZER" failed.
build (MEMORY_SANITIZER)
The operation was canceled.
build (UNDEFINED_BEHAVIOR_SANITIZER)
The job was canceled because "THREAD_SANITIZER" failed.
build (UNDEFINED_BEHAVIOR_SANITIZER)
The operation was canceled.