Skip to content

23.11.0

23.11.0 #201

Triggered via push November 23, 2023 07:13
Status Failure
Total duration 1m 44s
Artifacts

run-tox.yml

on: push
pre-commit
11s
pre-commit
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
tests (3.11)
Process completed with exit code 1.
tests (3.9)
Process completed with exit code 1.
tests (3.8)
Process completed with exit code 1.
tests (3.10)
The job was canceled because "_3_11" failed.
tests (3.10)
The operation was canceled.